PREP DAY 1 OF 2Monday, September 21
Kim R. driveway tear-out
1420 Sugarloaf Parkway, Lawrenceville
On this job: Marco, Tony, Jose
Bring: small bobcat, dump trailer, saw
Gate: left side is tight, unlocked by 7:30
What has to get done
2 of 6 done
Photos from today
These go straight to the office and to the job file.




Notes on the job
Irrigation line on the left side is only about 4 inches down. Moved the forms in 8 inches so we do not cut it.
Marco · 9:12am
Customer asked us to leave the right side open until the pour so she can get her car out.
Angel · Yesterday
Concrete and materials
Yards ordered for the pour
14
14 yards ordered for Wednesday at 8am, fiber mix.